asbestos abatement services

We specialize in commercial and residential asbestos abatement services.

safe & effective asbestos abatement services

Our team specializes in providing top-quality asbestos removal and remediation services to clients in the Dallas-Fort Worth (DFW) metroplex. Our team of experienced professionals is committed to delivering safe and effective asbestos abatement solutions that meet the unique needs of each client.

What will you get with asbestos abatement services?

technology

We use specialized techniques and equipment, such as negative air machines and HEPA vacuums, to ensure that the surrounding environment is free from any asbestos fibers.

removal

Our team will work diligently to safely remove and dispose of all asbestos-containing materials, including flooring, insulation, and roofing materials, among others. 

safety

Our team is licensed and certified to provide asbestos abatement services in the DFW metroplex, and we carry liability insurance to protect our clients in the unlikely event of any issues.

Support

We work closely with our clients to ensure their needs are met, and we provide ongoing support throughout the entire asbestos removal process. 

Material Removal Includes OSHA Class I/II Materials:

Class I Materials

Thermal System Insulation (TSI), Surfacing Asbestos Containing Material, Presumed Asbestos Containing Materials (25 linear or 10 sq. feet or more)

Class II Materials

ACM work that is not TSI or Surfacing Materials, including but not limited to wallboard, floor tile, sheeting, roofing and siding shingles, and construction mastics

The process

Step 1
On-site evaluation

A consultant will inspect the nature of the ACM, take randomized samples of the ACM, and check the analytical results of those bulk samples. Afterwards, they will complete and deliver an Asbestos Survey Report and Work Plan.

Step 2
Pre-construction meeting

Key on-site personnel will review the work plan and scope of project and submit any state and federally required notifications.

Step 3
regulating the work area

On-site personnel will conduct a final walkthrough to ensure initial survey conditions are unvaried, demarcate work area with warning signs, put up critical barriers, cover walls and/or floors with sheets of poly plastic, set up proper decontamination areas, and set up all negative air machines to maintain negative air pressure to minimize dust particles while work is ongoing.

Step 4
removal & cleanup

Sprayers will be used to wet all materials before demo, and HEPA Vacuums will be used to ensure the site is clean and all debris is containerized before the end of every work shift. Afterwards, technicians will complete the gross removal of all ACM and conduct a visual inspection and walkthrough to ensure no residual ACM in work area. Pre-clearance testing is then executed and outer layer of poly is removed before final testing is performed. Once the work area passes final clearance, it is cleared for re-occupancy.

Schedule an appointment today

If you’re interested in addressing asbestos in your property, give us a call or fill out our online form today. We’d love to work with you.