Most writing about asbestos is aimed at someone who just found it and wants it gone. That is rarely your situation. If you manage commercial property in the Dallas-Fort Worth metroplex and the building went up before the mid-1980s, the real question is how to run it for years without anyone getting hurt and without a routine service call becoming a regulatory problem. That is an ongoing duty.
With no survey on file, the regulation assumes an answer
OSHA’s construction standard, 29 CFR 1926.1101, defines Presumed Asbestos Containing Material — PACM — as thermal system insulation and surfacing material found in buildings constructed no later than 1980: pipe and boiler insulation, sprayed-on and troweled-on fireproofing, acoustic plaster. Absent a survey, those materials are asbestos as far as OSHA is concerned. The general industry standard at 29 CFR 1910.1001 extends comparable treatment to asphalt and vinyl flooring installed no later than 1980.
The presumption is rebuttable, but only on evidence: under 1926.1101(k)(5), an inspection conducted under AHERA requirements, or bulk sampling by an accredited inspector or certified industrial hygienist analyzed by a proficient laboratory. That is what asbestos testing is for, and why we use accredited laboratories.
Managing it in place is usually the right call, and the cheaper one
Property managers often assume the responsible move is removal. EPA says otherwise. In Managing Asbestos in Place, it states that “removal is often not a building owner’s best course of action to reduce asbestos exposure. In fact, an improper removal can create a dangerous situation where none previously existed.” EPA requires removal principally to prevent significant public exposure during demolition or renovation, and otherwise recommends proactive in-place management.
Intact material in good condition is not releasing fibers, and tearing it out is the most reliable way to put fibers into the air. Full removal in an occupied multi-story building typically runs into the tens of thousands of dollars and up; in-place management usually costs a fraction of that per year. Removal earns its keep when material is damaged, keeps getting disturbed, or is in the path of a renovation anyway. Our commercial asbestos team will tell you which situation you are in, and you will have the scope and cost in writing before any work begins.
What an O&M program actually involves
EPA describes an operations and maintenance program as “a formulated plan of training, cleaning, work practices, and surveillance to maintain asbestos-containing materials within buildings in good condition.” For an owner, that means:
- A current inventory with condition ratings — every homogeneous area of known or presumed material, where it is and what shape it is in.
- Written work practices for anything that could contact it, from changing a ceiling tile to pulling cable above a corridor.
- Trained in-house staff, with awareness training suited to what they may contact.
- Periodic surveillance, so degradation is documented before it becomes an exposure event.
- Cleaning and response protocols for debris, water damage above suspect material, and small releases.
- A named responsible person. If nobody owns the program, it does not exist.
Texas adds to that. Under 25 TAC 296.191, a public building owner must develop a management plan to control asbestos-containing material during operations and maintenance, renovation and demolition, and must use a licensed O&M contractor for small-scale, short-duration O&M activity or cleanup affecting asbestos. That category is genuinely small — the rule ties it to work fitting in a single standard 60-inch by 60-inch glove bag or one prefabricated mini-containment. Past that, it is a project. Periodic air quality testing shows the program is working rather than merely written.
The duty to tell people before they open a ceiling
This requirement is missed most often, and it sits squarely on the owner. Under 1926.1101(k)(2)(i), before work subject to the standard begins, building and facility owners must determine the presence, location and quantity of asbestos-containing and presumed asbestos-containing material at the work site. Under (k)(2)(ii), they must then notify:
- Prospective employers bidding for work whose employees can reasonably be expected to work in or adjacent to areas containing the material
- The owner’s own employees who will work in or adjacent to those areas
- On multi-employer worksites, all employers of employees performing work within or adjacent to those areas
- Tenants who will occupy areas containing the material
Notification may be in writing or a personal communication. Put it in writing anyway — a verbal warning to a subcontractor’s foreman is worth nothing eighteen months later. The general industry standard also requires owners to keep records of the material’s presence, location and quantity for the duration of ownership and transfer them to successive owners.
When nobody warned the HVAC tech
A plumber cuts into a chase and pulls out thirty-year-old pipe wrap. An electrician drills through a fireproofed beam. Nobody told them, so nobody took precautions. OSHA classifies repair and maintenance where asbestos-containing material is likely to be disturbed as Class III work, with its own control requirements. Done unprotected, it leaves you with a contaminated area, occupants who were in it, workers with no exposure assessment, and a cleanup that must be handled by licensed people — almost always costlier than the notification would have been.
If it has already happened, treat it as urgent. Stop work, restrict the area, and do not let anyone sweep or vacuum. We are reachable 24/7/365 and can have licensed, insured, certified technicians on site within 24 hours to assess, contain and handle the abatement and cleanup, with air clearance sampling before the space is reoccupied.
Where a tenant fit-out becomes regulated asbestos work
Build-outs cross into regulated territory faster than most people expect. Under 25 TAC 296.191(d), before any renovation or dismantling within or outside a public building, commercial building or facility, the owner must have an asbestos survey performed, covering all immediately surrounding areas that could foreseeably be disturbed. Demising wall moves, ceiling grid changes, flooring replacement and above-ceiling mechanical work all qualify. In public buildings the survey must be done by an appropriately licensed person, or by a Texas-registered architect or licensed engineer certifying from construction documentation that no asbestos is present; in commercial buildings, an accredited inspector with the required training may perform it.
Two thresholds then matter. The asbestos NESHAP at 40 CFR 61.145 requires the affected facility to be thoroughly inspected before demolition or renovation, and its full requirements attach when the regulated asbestos-containing material to be disturbed reaches at least 260 linear feet on pipes, 160 square feet on other facility components, or 35 cubic feet off facility components. Written notification must be postmarked or delivered at least 10 working days before work begins. Texas is stricter for public buildings: under 25 TAC 296.251, DSHS notification is required for any demolition whether or not asbestos has been identified, and for abatement of any amount of asbestos-containing building material, again on 10 working days’ notice. That is roughly two calendar weeks — build it into the schedule rather than finding it the week the tenant expects keys. A pre-demolition or pre-renovation survey keeps that schedule intact, and we can coordinate it with demolition work when a project calls for both.
What belongs in the building file
Assume every document will be read by someone who was not there. A defensible file holds all survey reports with laboratory results, the current management plan and O&M procedures, surveillance logs, staff training records, written notifications to contractors and tenants, DSHS notification forms, abatement documentation with waste manifests, and air clearance results. Texas requires public building owners to keep architect or engineer certifications, safety data sheets and previous asbestos surveys, and requires licensed consultants to retain survey reports, sampling results and management plans for 30 years.
The file earns its keep at sale or refinance, when diligence asks what is in the building, what condition it is in, and what you have done about it. A complete file answers all three in an afternoon. An empty one becomes a re-survey on someone else’s timeline, or a holdback.
Getting a program in place
If you manage a pre-1980 commercial property in Dallas, Tarrant, Collin or Denton county and cannot put your hands on a current survey today, start there. From our Plano office we handle surveys, sampling through accredited laboratories, O&M program development, and abatement when it is warranted. Call (469) 283-5227 to talk through your portfolio, and you will have an itemized written quote covering scope and cost before anyone begins.